How to check and accept the installation of underfloor heating at home? Going to the construction site just to turn around does not reveal the problem. So how can we know the construction quality is not up to standard?



This issue will bring you a floor heating supervision strategy! Home ready to install underfloor heating friends can first collect, in case of emergency ~


Preliminary work


① Before paving, first check whether the ground is level. If the local drop is large, you need to level it first to prevent the later ground drum, settlement, cracking and other phenomena. You should also confirm with the HVAC company whether the floor of the balcony and bathroom needs to be waterproofed again, just in case.


② Material acceptance work. Suggest that owners against the quotation on the brand, size, quantity, model, etc., to do a good job checking acceptance, to avoid unscrupulous businessmen to second best, or in the transportation process of damage and so on.



Key points


1. Check the manifold


First of all, focus on observing whether the manifold and the ground parallel, generally is installed on the top of the manifold, the water collector is installed in the bottom, the middle interval of 200mm, the center of the collector from the ground is not less than 300 mm. Secondly, check the joints, a variety of valves at whether the tightness of the water rust and water stains, to avoid leakage; In addition also need to pay attention to is the bottom of the pipeline connected to the ground of the bending, there should be a pipe elbow; exposed pipes are protected with insulation sleeves to prevent localized overheating.



2. Construction of insulation materials


Insulation auxiliary materials in the whole floor heating system, belong to the hidden and critical existence. In the construction of attention to stare at the following points, basically will not go wrong.


Check whether the insulation board and reflective film are laid flat, and the seams need to be taped with aluminum foil tape. When selecting materials, it is recommended to emphasize with the HVAC company to use environmentally friendly XPS board for the insulation board and pure aluminum for the reflective film, which will be more effective.



The floor and wall interface should also be laid with a border special insulation strip, which serves to prevent the loss of heat from the floor heating along the wall, but also plays a role in the expansion and contraction of the cement layer.


3. Acceptance of floor heating pipe construction


Floor heating coils can not have splicing, must be a pipe, if you can not distinguish then confirming with the construction worker again and again is necessary; observation of the pipe whether there are scratches, or serious friction marks, which may affect the service life of the pipeline; floor heating coils should be a uniform spacing, or else it is easy to lead to uneven heat transfer, affecting the heating effect. For φ16 pipe spacing should be 15cm, φ20 pipe spacing should be 20cm, reasonable angle of pipe bending when coiling.



4. Acceptance of pressure test


After the initial installation is completed need to carry out a pressure test to check the tightness of the loops, which is very important. Generally, the constructor will help to inspect, the test results are qualified with no seepage or leakage.


Once the pressure test is complete, it's time to backfill the floor heating. Wet backfill is usually done with pea gravel concrete, but some homeowners choose to backfill with gypsum-based self-leveling so that the backfill layer will be thinner and save floor height. However, it should be noted that the self-leveling should choose high thermal conductivity models, so as not to affect the floor heating heat dissipation effect.



Acceptance of floor heating construction is by no means limited to the installation completed after the "test temperature" part, each stage may affect the final effect. If you are usually too busy to take care of, it is recommended to find a reliable HVAC company or construction team, generally formal, big brand of construction work will be more standardized, but also take the initiative to help owners acceptance and debugging.